Bathroom Pricing

HALL BATH – Typical (5’x8′)
Design, labor, materials, flooring, and countertops are included in the estimates below. Appliances, plumbing fixtures and painting are NOT included.
On the pricing chart below; “Basic”, “Mid” & “Upper” levels distinguish which finish you choose.
BASIC-LEVEL
$35K+
BASIC FINISHES
- Keep Existing Tub Layout
- Ceramic Tile Floor & Shower Walls
- Level 1 Vanity Cabinetry
- Level 1 Remnant Countertop
- Electrical Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
MID-LEVEL
$40K+
MEDIUM FINISHES
- Replace Existing Tub with Tub or Acrylic Shower Base
- Porcelain Tile Floor & Shower Walls
- Level 2 Vanity Cabinetry
- Remnant Countertop
- Electrical Changes/Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations
UPPER-LEVEL
$45K+
HIGH END FINISHES
- Remove Tub & Replace with Tile Base Shower
- Porcelain or Natural Stone Tile Floor & Shower
- Level 3 Vanity Cabinetry
- Remnant Countertop & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved
MASTER BATHROOM
BASIC-LEVEL
$55K+
BASIC FINISHES
- Replace Existing Tub & Shower Base with New Acrylic Tub & Shower Base
- (Keep Existing Sizes & Locations)
- Porcelain Tile Floor & Shower Walls
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures Remain in the Same Locations
MID-LEVEL
$65K+
MEDIUM FINISHES
- Remove Existing Tub & Shower
- Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
- Porcelain Tile Floor, Shower Base & Walls
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Limited Fixture Movement
UPPER-LEVEL
$75K+
HIGH END FINISHES, EXPANDED SIZE
- Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
- Natural Stone Floor, Shower Base & Walls
- Level 3 Vanity Cabinetry w/Linen Cabinet
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved